General Contractor in Sunset, FL
Established ranch homes across unincorporated SW Miami-Dade: prime stock for remodels, additions, and investor repositioning.
Sunset’s 1960s–70s single-family stock is structurally sound and functionally dated, exactly the profile that rewards a well-run remodel or addition. We open layouts, rebuild kitchens and baths, and add square footage with engineering handled as one scope.
Permitting runs through Miami-Dade County RER, which we manage in-house, and every envelope touch is built to HVHZ standards with documented assemblies.
Services We Deliver in Sunset
Recent Work Near Sunset

The Westchester Value-Add
View Project →What Sunset Owners Ask
The local specifics: permitting, housing stock, and the work this market actually needs.
What does remodeling in the Sunset area usually involve?
Sunset is an established unincorporated Miami-Dade neighborhood of single-family homes, permitted through the County, and Unique Construction most often runs kitchen and bath modernization, flooring continuity, and structural opening-up of the original compartmentalized plans. Homes of this vintage frequently carry load on interior walls, so an open-concept scope starts by verifying which walls can come out and what beam replaces them.
That answer sets the ceiling line. A flush beam keeps the plane unbroken but needs new bearing carried down to the footing; a dropped beam is simpler to frame and changes how duct and lighting runs cross the opening. Settling it before demolition is what keeps the finish plan intact.
Sunset Construction FAQs
Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Miami-Dade County, including Sunset.
