General Contractor in Glenvar Heights, FL
A quiet, established unincorporated pocket where remodels, additions, and value-add work all pencil.
Glenvar Heights sits in the heart of SW Miami-Dade’s residential belt: mature lots, solid mid-century homes, and steady demand. We deliver whole-home renovations, structural additions, and investor turns here with the same documented process we run county-wide.
Miami-Dade RER permitting, HVHZ compliance, and engineering coordination are all handled by one accountable team.
Services We Deliver in Glenvar Heights
Recent Work Near Glenvar Heights

The Westchester Value-Add
View Project →What Glenvar Heights Owners Ask
The local specifics: permitting, housing stock, and the work this market actually needs.
Does Glenvar Heights permit through Miami-Dade County?
Yes. Glenvar Heights is unincorporated Miami-Dade, so building permits are issued by the County, and Unique Construction handles County submittals and inspections as part of the project rather than leaving them to the owner. The area’s mid-century homes draw additions and open-plan conversions, both structural scopes that require engineered drawings before a County submittal.
Which walls can actually come out is settled by the engineer, not by the floor plan, so the beam and its bearing points are resolved before demolition rather than after. A scope changed once the set is in returns to County review as a revision.
Glenvar Heights Construction FAQs
Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Miami-Dade County, including Glenvar Heights.
