All Home RemodelingHome Remodeling · Service 04

Flooring Remodel

Wide-plank wood, tile, and luxury vinyl flooring, installed continuously through the home for one clean, unbroken sightline.

Floors that run the whole house, not room by room.

Flooring is the easiest upgrade to get wrong by treating it room by room: different materials, different heights, transition strips everywhere. We plan the whole-house flooring package up front so wide-plank wood, tile, or luxury vinyl runs continuously, with transitions only where the material genuinely has to change.

We also handle what is under the floor: subfloor leveling, moisture testing, and, in older Miami-Dade homes, the terrazzo question of restoring the original slab or building over it. Whichever direction is right for your home, the surface only looks good if what is beneath it was prepped correctly.

Scope of Work

  • Wide-plank engineered & solid wood
  • Porcelain & large-format tile
  • Luxury vinyl plank (LVP)
  • Subfloor leveling & prep
  • Terrazzo restoration or overlay
  • Whole-house material continuity
  • Baseboard & transition detail
  • Moisture testing & mitigation
Other Home Remodeling ServicesLuxury Residential  ·  Kitchen Remodel  ·  Bathroom Remodel  ·  Painting  ·  Plastering
Service Brief
EngagementGC · Design-Build
Typical ScopeWhole-house or per-room
PrepSubfloor-first
MaterialsWood · tile · LVP · terrazzo

“Michael Jordan of Contractors! Joel Ramos and his staff did an amazing job with the remodeling of my bathroom and the flooring of the entire apartment. Their professionalism, efficiency, attention to detail and attentiveness were exceptional. Their prices were very fair. I would rehire Mr. Ramos and Unique Construction in a heartbeat!! Anyone who does not hire them is doing themselves a disservice!”

Ira S. · HomeAdvisor review

What Miami Owners Ask About Flooring Remodel

Specific answers for flooring remodel in Miami-Dade and Broward: the questions that actually decide the scope.

Quick Answer

Does a concrete slab need testing before flooring goes down?

For most materials, yes. A Florida slab-on-grade sits on damp sand and can push enough vapor through to break an adhesive bond or release tile from the mortar long after installation. A test tells you whether the slab falls inside the flooring manufacturer’s limit or whether it needs a moisture mitigation coating first.

The failure shows up months later and looks like a product defect. It is usually a slab nobody measured, and by then the fix means removing the floor you just paid for.

Quick Answer

Should terrazzo floors be restored or covered over?

Either can be correct, and the slab decides. Sound terrazzo is a finish worth recovering; a cracked or heavily patched one is a substrate problem before it is a finish question. We grind a test area in older Miami-Dade homes and look at what comes up before recommending restoration or an overlay.

Restoration is grinding and polishing what is already there; covering is a new floor plus whatever preparation the slab needs. Deciding without looking at the slab is how both options go wrong.

Have a Flooring Remodel project?

Tell us the scope. We’ll come back with a real plan and a real number.