Licensed General Contractor — Miami-Dade & Broward, FL

Miami General Contractor for Commercial, Ground-Up & Structural Construction

Build-outs, new construction, additions and load-bearing work, and investment repositioning — with permitting and inspections carried by the same licensed team, and high-end remodeling held to the same standard.

Licensed & Insured Commercial & Residential One Accountable Team
15+ Years Building
320+ Projects Delivered
1M+ Sq Ft Built & Renovated
240+ Homes Remodeled
01 / Services

Six disciplines.
One accountable builder.

From a 40-unit repositioning to a ground-up commercial build to a waterfront custom home — the same licensed team, the same standard of delivery, across every line of work.

01 / 06

Commercial Construction

Office, retail, hospitality, and multi-family construction and buildouts — delivered with minimal disruption and full documentation.

Explore Service
02 / 06

Ground-Up Construction

New construction from foundation to final finish — single-family, multi-family, and small commercial, built to current code and HVHZ standards.

Explore Service
03 / 06

Additions & Structural

Home additions, second stories, structural modifications, and open-concept conversions — engineered, permitted, and seamlessly integrated.

Explore Service
04 / 06

Investment Properties

Fix-and-flip, value-add, and BRRRR-ready renovations scoped to your underwriting — fast, predictable, and built to maximize resale or rent.

Explore Service
05 / 06

Property Management Partnerships

Turnkey unit turns, capital improvements, and maintenance programs for multi-family and commercial portfolios — one contractor, every door.

Explore Service
06 / 06

Home Remodeling

Whole-home remodels, kitchens, baths, flooring, painting, and plastering — one residential contractor team, run with the same discipline as a commercial build.

Explore Service
Completed two-story fourplex built by Unique Construction in Wynwood, Miami — exterior view
Exterior · Cleared Lot
02 / Selected Work

Proof, not promises.

03 / Method

How we deliver.

A disciplined preconstruction-first process keeps budget, schedule, and quality under control from the first feasibility review to the final walkthrough.

01
Phase 01

Preconstruction & Feasibility

Site assessment, due-diligence support, budgeting, value engineering, and a realistic schedule before a dollar is committed.

02
Phase 02

Estimating & Buyout

Transparent, line-item proposals and competitive trade buyout — so you know exactly what you're paying for and why.

03
Phase 03

Construction Management

One accountable team running permitting, trades, inspections, and reporting — with proactive communication throughout.

04
Phase 04

Closeout & Handover

Punch-list, inspections, warranties, and a clean turnover package — delivered on schedule and ready for occupancy or sale.

04 / Permitting & Claims

The parts that stall a project.

Two things hold up more work than construction ever does: getting a permit through review, and rebuilding after a loss. Both are run by the same licensed team that builds the job.

Permitting & Inspections

We pull the permit and see it through.

We assemble and submit the package, track every plan-review comment as a scope item with an owner and a date, and carry the job through the inspection sequence to closeout — Miami-Dade and Broward, including HVHZ product approvals. It is part of the contract, not a line you chase yourself.

How permitting actually works
Claim-Funded Repair

We build the repair, and document it.

When a repair is funded by an insurance claim, we do the construction. We document the existing conditions and the work as it proceeds, produce a scope and estimate for the work we would perform, and coordinate the build alongside whoever you have retained to handle the claim itself. We are a general contractor, not a public adjuster — we do not negotiate, adjust, interpret, or settle claims.

Talk to us about a rebuild
05 / Who We Serve

Built for how you operate.

Different clients measure success differently. We structure each engagement around the outcome that matters to you.

Developers & Commercial

On budget. On schedule. On record.

Ground-up and commercial buildouts delivered with formal preconstruction, transparent reporting, and the accountability serious projects require.

Investors

Speed to value, protected margin.

Fix-and-flip, value-add, and repositioning scoped to your underwriting — fast turnarounds, predictable costs, and finishes that move the comp.

Property Managers

One contractor for the whole portfolio.

Unit turns, capital improvements, and ongoing maintenance across multi-family and commercial assets — one point of contact, consistent quality.

Homeowners

Custom work, professionally run.

Luxury remodels and additions handled like a commercial project — clear scope, real timelines, and craftsmanship you can live with for decades.

06 / Capabilities

Everything a stakeholder needs, in one brief.

Our capability statement is built for the people who vet contractors before they hire them — developers, investors, lenders, and property managers.

  • License & insurance verification
  • Service capabilities & capacity
  • Delivery method & safety record
  • Selected project data & references
Capability Statement

Request the brief

Sent to your inbox within minutes — no sales call required.

Completed luxury residential remodel interior by Unique Construction — open living space in Country Walk, Miami-Dade FL
UC
Est. 2011
07 / The Firm

A general contractor that operates like an institution.

Unique Construction was built on a simple idea: the discipline that runs a commercial job — preconstruction, documentation, accountability — produces a better result on every job, including the custom home down the street.

That standard is why developers, investors, property managers, and homeowners all sign with the same firm. One license. One team. One way of working.

LicensingFL Certified General Contractor
CoverageFully insured
FootprintMiami-Dade · Broward · South Florida
EngagementsGC · Design-Build · Consulting
08 / Reviews

In their words, not ours.

Published on our Google and HomeAdvisor profiles and quoted here exactly as written — no edits, no trimming.

We have used Unique Construction on many home projects and would highly recommend them! They are easy to work with and very accommodating and professional.

Sean C.Google review

Amazing company from estimate to completion of project. Responsive to all questions, punctual, and all tradespeople were highly skilled in their craft. Great attention to detail, professional and a pleasure to work with. Highly recommended!

Erika R.HomeAdvisor review

From start to finish, Unique Construction was professional, cordial, punctual, and overall fantastic. The project was started right away, and it was finished on time. I was consulted any time there was a question or potential change, and they worked with me and my wife to ensure all the details were correct. I will gladly use Unique Construction again if I need something done down the road.

Alessandro M.HomeAdvisor review

We picked three. All of them are public, including the ones we did not pick. Read every review on our Google Business Profile

09 / Answers

Before you ask.

Yes. Unique Construction is a Florida Certified General Contractor and carries full insurance. Ask us for the current certificate of insurance and the license verification — and ask the same of any other contractor you are considering, before you sign rather than after.

Yes. We scope to your underwriting, document the job so you can read it without standing in it, and hold the budget and schedule you approved. Investor and portfolio repositioning is one of the six service lines we offer, alongside commercial, ground-up, additions and remodeling.

From single-unit turns and residential remodels through ground-up and commercial construction. Size matters less than the permit path, the amount of structure involved, and whether the building has to keep operating while we build.

Often, yes. An open or expired permit stays attached to the property until the work is inspected and signed off, and most owners find out about theirs in the middle of a sale or a refinance. We look at what got built, what the permit on file covers, and what the building department needs in order to close it — then tell you whether the path is an inspection, a revision or a new set of drawings. If you are buying a house that carries one, read what an unpermitted shortcut does to a sale first.

Yes. We set portfolio work up as a program rather than as a series of separate bids: one written specification, one point of contact, and one billing format across the properties you hand us.

We set it in preconstruction rather than guessing at it. The permit path, the long-lead items and the trade sequence for your scope produce the schedule, and once it is committed that is the date we build to. Anyone who quotes you a duration before seeing drawings is quoting an average.

Yes. We work as a general contractor, as a design-build partner, and in a consulting capacity for feasibility and budgeting — whichever structure fits your project and team.

Let's build your
next project.

Tell us what you're planning. We'll respond within one business day with next steps — and usually a same-day call.