Bathroom Remodel
Full and partial bathroom renovations (walk-in showers, freestanding tubs, tile, and vanities), waterproofed and built to last.
Bathrooms built to spa standard.
A bathroom remodel lives or dies on what you cannot see: waterproofing, slope-to-drain, and ventilation done correctly. We treat those details as the actual deliverable, then build the visible finish on top of them: full-height tile, frameless glass, freestanding tubs, and custom vanities.
From a single guest bath to a full primary suite with a wet room, the process is the same: locked scope, real selections, and a rough-in built to be inspected, with supply lines pressure-tested, blocking set, and waterproofing continuous before any tile goes on.
Scope of Work
- Walk-in & wet-room showers
- Freestanding & alcove tubs
- Full-height tile surrounds
- Waterproofing & slope-to-drain
- Custom vanities & countertops
- Frameless glass enclosures
- Ventilation & electrical
- Heated flooring options




“They did remodeling for my shower. I am very pleased with their work. The team is professional, started working 8am every day, made the house clean. After the project, they always came immediately when I called for some minor fixes. Good team, high quality, highly recommended.”
What Miami Owners Ask About Bathroom Remodel
Specific answers for bathroom remodel in Miami-Dade and Broward: the questions that actually decide the scope.
What makes a curbless shower different to build?
The waterproofing has to run well past the shower itself. With no curb, nothing holds water inside the enclosure, so the membrane carries across the whole bathroom floor and up the walls beyond the splash zone. The drain also needs either a recess formed in the slab or the finished floor raised to create fall.
Curbless is where the tile setter and the plumber have to agree before either one starts. Drain location, slope direction, and membrane type are a single decision, and taking them out of order produces a shower that drains toward the door.
Can a bathroom be remodeled without moving the plumbing?
Yes, and keeping fixtures where they are is usually the more economical scope. During preconstruction we work out whether the layout you want fits the existing rough-in or whether it needs drains moved. That one question separates two very different projects in the same Miami-Dade bathroom.
Drain relocation is where cost steps up, and on the slab-on-grade homes common across South Florida it means opening concrete rather than working between joists.
Have a Bathroom Remodel project?
Tell us the scope. We’ll come back with a real plan and a real number.