All ServicesService 06

Home Remodeling

Whole-home remodels, kitchens, baths, flooring, painting, and plastering: one residential contractor team, run with the same discipline as a commercial build.

Remodeling, run like a real construction project.

Home Remodeling is our residential umbrella: whole-home transformations and luxury custom work alongside the trades that make up almost every remodel: kitchens, bathrooms, flooring, painting, and plastering. Whatever the scope, it gets the same documented process: clear drawings and selections, a real schedule, and one contractor accountable for the finished result rather than a homeowner refereeing between trades.

Explore the specific service below, or start with a whole-home remodel if you are opening up more than one room at a time.

Scope of Work

  • Whole-home remodels
  • Kitchen remodeling
  • Bathroom remodeling
  • Flooring installation & refinishing
  • Interior & exterior painting
  • Plastering & drywall
  • Architectural & millwork detail
  • Designer finish selection

Explore a Specific Remodeling Service

Luxury Residential
Kitchen Remodel
Bathroom Remodel
Flooring Remodel
Painting
Plastering
Service Brief
EngagementDesign-Build · GC
ScopeSingle room to whole home
ProcessSelections-managed
FinishBespoke / custom

Key Takeaways

  1. 01

    Cosmetic-only is a narrower category than homeowners expect. Moving one outlet or relocating a drain line usually crosses into permitted work, and you meet the unpermitted version of it again at resale or during an insurance claim.

  2. 02

    Managing the trades yourself trades a markup for sequencing risk. When the tile crew arrives before the plumbing rough-in passes inspection, you are the one who eats that day.

  3. 03

    Which rooms are in scope decides whether you can stay in the house, and you should have that answer in preconstruction. Families who find out during demolition end up in a hotel nobody budgeted for.

What Miami Owners Ask About Home Remodeling

Direct answers to the questions we field most often on home remodeling work in Miami-Dade and Broward.

Quick Answer

Do I need a permit to remodel a kitchen or bathroom in Miami-Dade?

Yes, in most cases. Kitchen and bathroom remodels in Miami-Dade that touch electrical, plumbing, mechanical or structure require permits, and the cosmetic-only exception is narrower than most owners expect: moving one outlet or relocating a drain line usually crosses into permitted work. Unique Construction pulls and manages the permits as part of the scope.

Who pulls the permit is not a formality. The permit record carries the name of whoever pulled it and the inspections are called against that name, which is why we hold it rather than asking an owner to sign for construction they are not managing.

Unpermitted work does not stay buried. It surfaces later, when the property is sold or when someone with a financial interest pulls the permit history, and by then the correction is a retroactive one on someone else’s timeline.

Quick Answer

Should I hire one general contractor or separate trades for a remodel?

Hiring one licensed general contractor gives you a single party accountable for the finished result. Unique Construction holds the schedule, the trade sequence, and the warranty as one scope, instead of leaving the homeowner to coordinate trades who each answer only for their own piece.

Managing trades directly can look cheaper on paper. What it actually does is transfer the sequencing risk to you: when the tile crew arrives before the plumbing rough-in passes inspection, someone has to absorb that day, and without a general contractor that someone is the homeowner.

The other difference is who owns a defect. When one contractor holds the whole scope, there is no argument about whether the crack is the drywall trade or the framer.

Quick Answer

Can I live in my house during a remodel?

Often yes, depending on which rooms are in scope. Unique Construction phases occupied remodels in Miami-Dade so a working kitchen or bathroom stays available where possible, with dust containment and daily cleanup as part of the scope rather than a courtesy.

Whole-home remodels and projects that take out the only kitchen or only bathroom are the cases where staying is usually worse than moving out for the duration. We tell you which category your project is in during preconstruction, not during demolition.

Have a Home Remodeling project?

Tell us the scope. We’ll come back with a real plan and a real number.