All Additions & StructuralAdditions & Structural · Service 04

Structural Beam & Steel

Steel and engineered-lumber beam work: long spans, moment frames, columns, and connections installed to approved structural drawings.

Long spans, done to the drawing.

Wide openings, spans that carry a floor above, and frames that resist lateral load all come down to steel or engineered lumber installed exactly as drawn. This is the scope underneath a load-bearing wall coming out, and it is what the structural permit is actually for. Connections, bearing points, and anchorage are where these details are either right or quietly wrong, and in South Florida the lateral requirements make that even less forgiving.

We coordinate directly with the structural engineer, handle fabrication and delivery logistics into tight residential sites, and install to the approved drawings with the inspections documented. Then we detail around it so the finished room does not look like it is hiding a beam.

Scope of Work

  • Steel beams, columns & moment frames
  • LVL & engineered lumber spans
  • Connection & anchorage detail
  • Bearing points & footing upgrades
  • Fabrication & site delivery logistics
  • Structural engineer coordination
  • Special inspections & sign-off
  • Finish detailing around structure
Service Brief
EngagementGC · Structural Scope
MaterialsSteel · LVL · engineered lumber
BasisApproved structural drawings
VerifiedInspection-documented

What Miami Owners Ask About Structural Beam & Steel

Specific answers for structural beam & steel in Miami-Dade and Broward: the questions that actually decide the scope.

Quick Answer

Who inspects a steel connection, and is it the building inspector?

Not always. Structural steel welding and high-strength bolted connections often require a special inspection by a licensed professional engaged for that purpose, separate from the municipal inspector. On residential work this catches owners out, because it is an appointment somebody has to schedule and pay for before the connection gets covered.

Whether it applies depends on the building and what the approved drawings call for, so confirm it with the engineer of record at permit rather than assuming either way. Sequence it wrongly and finished work has to come back open.

Quick Answer

How does steel get into a tight residential site?

Plan it before you order it. A beam that cannot reach its bearing points is a schedule problem no crew improvises around, so fabrication length, delivery route, and placement access get worked out together on constrained Miami-Dade lots. Sometimes that changes the member itself before anything is bought.

We resolve access, crane placement, and neighbor coordination in preconstruction, alongside the engineering.