Fix-and-Flip Renovations

Renovations scoped to a resale comp and a holding period — fast, fixed, and finished at the level the buyer in that neighborhood is actually paying for.

Scoped to the comp, not to taste.

On a flip, every finish decision is an underwriting decision. Spending above the comp does not come back at closing, and spending below it costs you days on market. So we scope from the exit: what the target buyer in that specific neighborhood expects, where the money visibly shows, and where it does not.

Then we protect the holding period. Scope locked before demolition, selections made up front rather than mid-project, trades sequenced so nothing waits on a decision, and weekly reporting you can hold a schedule against — because on a flip, time is the line item that quietly eats the margin.

Scope of Work

  • Scope built from the resale comp
  • Kitchens, baths & flooring packages
  • Curb appeal & exterior refresh
  • Paint, plaster & light-touch interiors
  • Permitted work where required
  • Locked scope before demolition
  • Fast, sequenced trade schedule
  • Weekly progress reporting
Other Investment Properties ServicesValue-Add & BRRRR Scopes  ·  Whole-Property Turns
Service Brief
EngagementInvestor GC
Scoped FromResale comp & exit plan
PriorityHolding period discipline
ReportingWeekly progress

What Miami Owners Ask About Fix-and-Flip Renovations

Specific answers for fix-and-flip renovations in Miami-Dade and Broward — the questions that actually decide the scope.

Quick Answer

What happens if the flip you bought has unpermitted work?

It becomes a scope decision before it becomes a permit problem. Somebody has to open the wall, find out what was done, and price bringing it into a permitted condition or removing it. Defer that until the property is under contract and you meet it again during the buyer’s inspection, with no time left.

The awkward version is work that functions fine, a converted room or a moved wall, with no record behind it. It still has to be resolved, and the cost of resolving it has nothing to do with how well it was built.

Quick Answer

How do you handle something unexpected found during demolition?

Demolition is the inspection you could not do before closing. Rotted framing, an out-of-level slab, an abandoned drain: these surface in the first week, and that timing is deliberate. We front-load demolition on investor projects so the bad news arrives while the budget and the exit plan can still absorb it.

How bad the find is matters less than when it lands. At demolition it is a line item. At drywall it means undoing everything installed since.