All Commercial ConstructionCommercial Construction · Service 03

Tenant Improvements & White-Box

Tenant improvement scopes and white-box conversions that make a space leasable: demolition, base building systems, and a clean shell ready for the next tenant.

Make the space leasable again.

A vacant commercial space rarely shows well as-is. Tenant improvement and white-box work is about resetting it to a condition a broker can lease and a tenant can build into: previous tenant improvements demolished, base building systems verified and capped correctly, walls and ceilings closed, and a clean, lit, code-compliant shell handed back.

We scope TI work from both directions: what a landlord is obligated to deliver, and what an incoming tenant will actually need for its retail, office or restaurant build-out, so the two do not overlap or leave a gap that stalls a lease at signing. Two items belong in that split before it is signed rather than after: the ADA and life-safety upgrades a change of use can pull in, and the phasing around neighbouring tenants who keep operating while the suite is under construction.

Scope of Work

  • White-box & vanilla shell conversions
  • Previous tenant improvement demolition
  • Demising walls & suite subdivision
  • Base building MEP verification & caps
  • Ceilings, lighting & life-safety
  • Storefront & entry work
  • Landlord vs tenant scope definition
  • Broker-ready turnover condition
Service Brief
EngagementGC · Landlord Program
ScopeWhite-box · TI allowance work
DrivesLeasing readiness
DefinitionLandlord/tenant split documented

What Miami Owners Ask About Tenant Improvements & White-Box

Specific answers for tenant improvements & white-box in Miami-Dade and Broward: the questions that actually decide the scope.

Quick Answer

Does white-box mean the same thing in every lease?

No, and that is the trap. There is no industry-standard definition. One lease means primed walls and an open ceiling; another means grid, lighting, HVAC distribution, and a restroom. Read the exhibit rather than the label, because a substantial amount of construction sits between those two versions.

Sprinkler heads catch people out. Heads set for an open deck have to drop to a finished ceiling, and whether that lands with the landlord or the tenant gets answered by the exhibit or by an argument.

Quick Answer

Does subdividing a commercial suite require permits?

Yes. A demising wall changes egress, life-safety, and usually mechanical zoning, so it is permitted work rather than a partition job. Splitting a Miami-Dade suite into separately leasable spaces means drawings, plan review, and inspections, and Unique Construction runs that alongside the construction itself.

Subdivision is rarely just a wall. Each new suite needs its own exit path, its own systems, and often its own restroom compliance.

Have a Tenant Improvements & White-Box project?

Tell us the scope. We’ll come back with a real plan and a real number.