Open-Concept Conversions

Turning compartmentalized homes into open living: walls removed, structure carried, and kitchen, dining, and living unified with continuous floors and ceilings.

One room where there used to be three.

Most older Miami-Dade homes were drawn as a series of small closed rooms. Opening them up is the single change that most alters how a house feels, and it is a structural project wearing a design brief, because the walls between those rooms are frequently carrying load.

We plan the conversion as a whole: which walls go and what beam replaces them, where the kitchen ends up once the sightlines change, how flooring runs continuously through the new space, and how lighting, HVAC returns, and ceiling planes get re-thought for one large room instead of three small ones.

Scope of Work

  • Multi-wall removal planning
  • Beam & post structural design
  • Kitchen relocation & sightlines
  • Continuous flooring across the space
  • Unified ceiling plane & soffits
  • Lighting & electrical re-plan
  • HVAC supply & return rebalancing
  • Structural permitting & inspection
Service Brief
EngagementGC · Design-Build
Typical ScopeKitchen · dining · living
IncludesStructural & MEP re-plan
ResultContinuous floor & ceiling

What Miami Owners Ask About Open-Concept Conversions

Specific answers for open-concept conversions in Miami-Dade and Broward: the questions that actually decide the scope.

Quick Answer

What is usually inside the wall you want to remove?

Wiring, a supply duct, and sometimes a drain. Wiring moves without much trouble. Ductwork is a design problem you can solve overhead. A waste line is the one that changes the project, because drains need continuous fall and cannot turn a corner into whatever cavity happens to be available.

Find out before the design is fixed, not after demolition. Relocating a drain in a slab-on-grade house means cutting concrete, and that belongs in the drawing stage where it is still a choice.

Quick Answer

Does an open plan make the house louder?

Yes, and it catches people off guard. Take out the walls and you take out the surfaces that used to absorb and block sound, so the television, the dishwasher, and a conversation share one volume. Soft flooring, upholstered furniture, and ceiling treatment recover most of it. Plan them in rather than adding them after.

Range ventilation belongs in the same conversation. A hood that coped in a closed kitchen now serves the room people sit in, and the duct run to get it outside depends on where the beam landed.

Have a Open-Concept Conversions project?

Tell us the scope. We’ll come back with a real plan and a real number.