General Contractor in Miami Shores, FL
A historic village of character homes: renovations and additions delivered to design-review standards.
Miami Shores’ 1920s–50s homes are the reason people move here, and the Village protects them through design review. We renovate and add to these houses in a way that honors the original architecture while rebuilding what’s behind the walls.
Submittals, permitting, and engineering are managed as part of the job, so the approval process never becomes your problem.
Services We Deliver in Miami Shores
What Miami Shores Owners Ask
The local specifics: permitting, housing stock, and the work this market actually needs.
Does Miami Shores review the design of exterior work?
Yes. Miami Shores Village applies its own architectural and zoning review to exterior work on top of the building permit, so Unique Construction accounts for Village standards during design rather than after a submittal. The Village’s older, architecturally consistent housing stock is the reason for that review, and it makes finish and elevation decisions less flexible here than in unincorporated areas.
Because that review runs ahead of the building permit, window profile, roof material and cladding get selected at design rather than at procurement. Swapping one later reopens the architectural review along with the permit set, which is the difference between a substitution and a restart.
Miami Shores Construction FAQs
Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Miami-Dade County, including Miami Shores.

