All AreasService Area · Miami-Dade

General Contractor in El Portal, FL

A pocket village of bungalows and mid-century homes between the bay and the boulevard: renovation territory with real character.

El Portal’s compact blocks hold some of the area’s most charming housing stock, much of it ready for careful modernization. We renovate these homes end to end (structure, systems, and finishes) while keeping the scale and character intact.

One team handles Village permitting, engineering coordination, and delivery.

Services We Deliver in El Portal

Commercial Construction
Ground-Up Construction
Additions & Structural
Investment Properties
Property Management Partnerships
Home Remodeling

What El Portal Owners Ask

The local specifics: permitting, housing stock, and the work this market actually needs.

Quick Answer

What limits the size of an addition on an El Portal lot?

Setbacks, lot coverage, and tree protection, usually before budget does. El Portal is its own village with its own permitting and heavily canopied lots, so Unique Construction checks those constraints, and the village’s tree requirements, before an addition is designed.

Tree and setback constraints frequently shape where an addition can go here, which is why they are checked before design rather than at review.

El Portal Construction FAQs

Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Miami-Dade County, including El Portal.

We Also ServeMiami Shores  ·  Morningside  ·  Biscayne Park  ·  North Miami