General Contractor in Southwest Ranches, FL
Acreage estates and equestrian properties: ground-up custom homes, barns, and outbuildings on rural-scale lots.
Southwest Ranches preserves a rural way of life minutes from the interstate, and its construction needs are unique: ground-up custom homes on acreage, major additions, barns and equestrian structures, and the sitework that ties them together.
We manage the Town’s rural development standards, drainage and civil coordination, and vertical construction as one scope.
Services We Deliver in Southwest Ranches
What Southwest Ranches Owners Ask
The local specifics: permitting, housing stock, and the work this market actually needs.
What can be built on a Southwest Ranches property?
Southwest Ranches has large residential parcels with rural zoning, which makes additions, guest houses, barns, and accessory structures common. Because these parcels frequently run on well and septic rather than municipal service, utility capacity decides what a parcel can carry. Unique Construction verifies both before design, then builds under Town permitting.
On acreage the site plan comes before the floor plan: where the well and drainfield already sit constrains where a new structure can go, and moving a footprint after design turns a small change into a resubmittal.
Southwest Ranches Construction FAQs
Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Broward County, including Southwest Ranches.

