General Contractor in Coconut Grove
Luxury residential work in the Grove: renovations and additions that respect the canopy, the character, and the standard the neighborhood expects.
Coconut Grove’s homes range from historic cottages to new waterfront estates, and the neighborhood expects craftsmanship either way. We deliver whole-home renovations, structural additions, and select ground-up work with the finish level Grove owners are buying.
City of Miami permitting, arborist coordination, and tight-lot logistics are handled as part of the scope, not discovered mid-project.
Services We Deliver in Coconut Grove
What Coconut Grove Owners Ask
The local specifics: permitting, housing stock, and the work this market actually needs.
What should I know about remodeling in Coconut Grove?
Coconut Grove sits within City of Miami jurisdiction and includes historic properties and heavy tree canopy, so Unique Construction checks for historic designation and tree protection requirements before scoping exterior work or an addition. The Grove’s older homes also vary widely in construction type, which changes the structural approach and what a new addition can be tied into.
A protected tree can move a footprint the structure would otherwise accept, so the arborist review and the framing plan are resolved together rather than one after the other. Those same trees decide where material stages and how a lift reaches the rear of the house, which is a cost that lands on the schedule instead of the drawings.
Coconut Grove Construction FAQs
Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Miami-Dade County, including Coconut Grove.

