General Contractor in Bay Harbor Islands, FL
Boutique multifamily and townhome construction on two islands in a wave of reinvestment.
Bay Harbor Islands is quietly redeveloping: older multifamily giving way to boutique buildings, and townhomes and condos commanding renovation-grade attention. We reposition existing buildings, renovate units, and deliver structural and envelope work to HVHZ standards.
For developers and owners, our documentation and schedule discipline keep small-site projects from becoming long ones.
Services We Deliver in Bay Harbor Islands
What Bay Harbor Islands Owners Ask
The local specifics: permitting, housing stock, and the work this market actually needs.
Who permits work in Bay Harbor Islands?
Bay Harbor Islands is its own town with its own building department, so permits are issued by the Town and not by Miami-Dade County. Unique Construction manages Town submittals and inspections directly, and because this is an island community, the flood requirements attached to the specific property get confirmed before anything below the first floor is priced.
Those requirements shape design rather than detailing: where mechanical equipment sits and how ground-floor space can be used are settled on the drawings, because changing them after the Town issues a permit means a revision, not a field adjustment.
Bay Harbor Islands Construction FAQs
Yes. Unique Construction Inc. is a Florida Certified General Contractor, licensed and fully insured, delivering commercial, ground-up, residential, and investment construction throughout Miami-Dade County, including Bay Harbor Islands.

